Antiqbook

LOCKYER, K G — An Introduction to Critical Path Analysis

Førsteudgave Signeret

Pitman. 1969. (ISBN: 9780273405443). Hardback. Hardback with D/J in good condition. Ex library with first page removed. 3rd edition Pitman 1969. - used books, secondhand books, out of print books, hard to find books, for sale, second-hand books, college books, student books, nonfiction, first edition, signed copies, non-fiction books delivered world wide. Excess postage may be required for books over 1 kg in weight outside the EU. ISBN 0-273-40544-6 0273405446. Used: Acceptable.

Machine translation by Google. The original description of the seller is leading. Log in or create an account to translate descriptions. Log ind
Bognummer: 10771 £11.69 (€14.01 | $15.44 | ¥2,466)
Handlinger
Anmod om oplysninger Tilbage til resultaterne
Pris
GBP 11.69
Forfatter
LOCKYER, K G
År
1969
Indbinding
Indbundet
Udgave
Førsteudgave
Signatur
Signeret eksemplar
Søgeord
9780273405443