Antiqbook

Lockyer, K. G. — An Introduction to Critical Path Analysis

Smudsomslag

Pitman, London, 1974. Reprint, Black Cloth. Near Fine/Near Fine. 9780273405443 illustrated by b/w. diagrams & charts; "this third edition of the pioneer work on Critical Path Analysis is suitable for both student and practitioner. It contains the distillation of wide experience in teaching and using C. P. A. and embraces all the useful manipulations and calculations currently being used. No mathematical expertise is implied or required. Critical Path Analysis (CPA) is a project management tool that sets out all the individual activities that make up a larger project & shows the order in which activities have to be undertaken including which activities can only take place once other activities have been completed & which activities can be undertaken simultaneously, thereby reducing the overall time taken to complete the whole project."; including index - 219 pages. Size: 8vo - over 7¾" - 9¾" tall. Quantity Available: 1. Category: Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. ISBN: 0273405446. ISBN/EAN: 9780273405443. Inventory No: SCE00042.

Machine translation by Google. The original description of the seller is leading. Log in or create an account to translate descriptions. Log ind
Bognummer: SCE00042 £6.00 (€7.19 | $7.93 | ¥1,265)

Billede

Handlinger
Anmod om oplysninger Tilbage til resultaterne
Pris
GBP 6.00
Forfatter
Lockyer, K. G.
År
1974
Indbinding
Paperback
Smudsomslag
Medfølger
Søgeord
BZDB227 Science/Engineering/Critical Path Analysis/C. P. A./Project Planning Science & Technology; C. P. A.; Project Planning; Engineering, Industrial, Trade. Unbranded ISBN: 0273405446 EAN: 9780273405443 Lockyer, K. G. An Introduction to Critical Path