Lahn,Werner. — Die Kogge von Bremen, Band I: Bauteile und Bauablauf. / The Hanse cog of Bremen, Vol. I. With an abbreviated English version. Translated by Judih Rsenthal.
Hamburg, Kabel, 1992. 250 pp. 161 b./w. ills. Softcover (= text vol.). 4to. + 16 pp. Stapled wrappers. 4to. (= specialized vocabulary / wordlist). + 37 large loose fold. plans. Together in orig. cardboard box. Oblong folio. (Schiften des Deutschen Schiffahrtsmuseums, Band 30). First volume of the set. A second volume was issued in 2003 (Die Kogge. Sternstunden der deutschen Schiffsarcha¨ologie).
Machine translation by Google. The original description of the seller is leading.
Log in or create an account to translate descriptions. Log ind
Bognummer:
303757
€300.00 ($326.78 | £250.82 | ¥51,999)